← All references
Marq Production · Marq Production · WWTP · Handover
Ivaň WWTP — switchboards for a new plant
Main technology and control switchboards for a new wastewater treatment plant in Ivaň.

What needed to be solved.
Prepare the new technology as a clear system and align electrical equipment with control and operator workflow.
What we delivered.
Manufacturing and installation of switchboard fields, local operation, safety labelling and cooperation during handover.
What it brings to operations.
The new facility starts with one consistent electrical and control architecture prepared for everyday operation.


